Nissan Motors specifies Vulcan S25 descaler

Hyundai Motors uses Vulcan S25 descaler for pipes, equipment and cooling towers Since Vulcan S25 was installed, the Hyundai Engineering Team has stopped the regular manual cleaning process.Observation: the flow rate with the Vulcan unit is now even higher than immediately after previous manual cleaning had been done. After Vulcan S25 had been installed for 6 months, the secondary pipes were opened: scale that had been left in piping had disappeared and all 9 secondary pipes had become clean (see photo).Observation: Biofilms in the cooling tower had disappeared since the Vulcan unit was...

Beijing – Kunlun Hotel

Kunlun Hotel uses Vulcan systems for limescale problems Kunlun Hotel is a five star hotel located in Beijing and uses Vulcan systems to solve the scale problems for the gas water heaters, the pipes and shower heads. It also helped to extend the cleaning intervals, save gas and improve...

China – Kunshan Xingbao Plastic

Plastic moulding factory uses Vulcan descaler to solve limescale problems After Vulcan S150 and S250 were installed, the clients are fully satisfied with their performance because they solved the scaling and iron filing problems on injection molding machines. The injection molding machine had been scaled badly for years, so it was always difficult to clean the pipe, especially the heat exchanger of the mold temperature controller. The traditional cleaning way is to use a chemical, but it is costly and difficult, and it also harms the heat exchangers and...

China – Shengli Oilfield

Petroleum company uses Vulcan descaler in oilfield application Installation purpose – The gas heats the water in the furnace, then the hot water heats the tubes, so that the water temperature in the tubes rises from 40 °C to 70 °C. The water in the tubes passes through the pump, transported to various wells.However, the heat exchanger efficiency is decreasing because of scale in the tubes. More gas has to be used to heat the furnace, so that the energy consumption is increased. Result – After installing the Vulcan S25 for 6 months, we found that there is no additional electricity usage, and the overall heat exchanger efficiency is still at 80%. We approved Vulcan and will make the follow-up purchase for the whole...

Dubai – Emaar Marina Plaza

Prestigious Dubai Tower uses Vulcan descaler systems Emaar Marina Plaza used Vulcan Anti-limescale technology To keep cooling towers efficient and stop dosing process To keep pipes and machinery free of scale and rust To reduce cost of maintenance, materials and labor time A prestigious office location, just off Interchange No 5 on Sheikh Zayed Road, Marina Plaza forms part of the Dubai Marina Mall and Address Marina Hotel complex. The building has 165 inspiring office spaces for businesses; as well as five retail units. The location is perfect for occupiers to enjoy the nearby facilities of the marina in their spare time and the two metro stations, Damac Properties and Jumeirah Lakes Towers, are ideal for...